Download 05 - Civil Engineering PDF

Title05 - Civil Engineering
File Size247.9 KB
Total Pages43
Table of Contents
                            PAPER-I

ADVANCED STRUCTURAL ANALYSIS
ANALYSIS OF SHELLS AND FOLDED PLATES
EXPERIMENTAL STRESS ANALYSIS
GROUND WATER EXPLORATION AND WATERSHED MANAGEMENT
	1. Ground Water Hydrology by Raghunath
HYDRAULIC STRUCTURES
	TEXT BOOKS
	IRRIGATION MANAGEMENT
PRESTRESSED CONCRETE
	STOCHASTIC HYDROLOGY
WATER RESOURCES SYSTEMS PLANNING AND MANAGEMENT
1. Pavement management system: Components of PMS and their activities; Major steps in implementing PMS; Inputs; Design ;Construction and Maintenance; Rehabilitation and Feedback systems; Examples of HDM and RTIM packages; Highway financing; Fund generation; Evaluating alternate strategies and Decision criteria
2. Pavement Inventories and Evaluation: Serviceability Concepts ;Visual Rating ; Pavement Serviceability Index; Roughness Measurements ;Distress Modes – Cracking Rutting Etc; Pavement Deflection – Different Methods, Skid Resistance, Roughness, Safety – Aspects; Inventory System – Assessment of Deficiencies
3. Pavement Maintenance and Quality Control: Causes of Deterioration, Traffic and Environmental Factors, Pavement Performance Modelling Approaches and Methods of Maintaining WBM, Bitumen and Cement Concrete Roads, Quality Assurance; Quality Control – ISO 9000 , Sampling Techniques – Tolerances and Controls related to Profile and Compaction
4. Construction of Base, Subbase, Shoulders and Drain: Roadway and Drain Excavation, Excavation and Blasting, Embankment Construction, Construction of Gravel Base, Cement Stabilised Sub- Bases, WBM Bases, Wet Mix Construction; Crushed Cement Bases, Shoulder Construction; Drainage Surface, Turfing Sand Drains; Sand Wicks; Rope Drains, Geo- Textile Drainage; Preloading Techniques
5. Bituminous Pavement Construction: Preparation and Laying of Tack Coat; Bituminous Macadam ,Penetration Macadam, Built up Spray Grout, Open Graded Premix, Mix Seal, Semi-Dense Asphalt Concrete-Interface Treatments and Overlay Construction, IRC Specifications, Introducing Mechanical Mixers, Pavers, Finishers
8. Pavement Maintenance Management: Components of Maintenance Management and Related Activities – Network and Project Level Analysis –Budgeting; Prioritization Techniques and Formulation of Maintenance Strategies
	Subject Code: R50559
	Subject Code: R50560
	HYDROPOWER DEVELOPMENT
	Subject Code: R50563
STABILITY OF STRUCTURES
STRUCTURAL DYNAMICS
	THEORY OF ELASTICITY AND PLASTICITY
		TEXT BOOKS & REFERENCE BOOKS:
GIS IN TRANSPORTATION ENGINEERING
                        
Document Text Contents
Page 22

Syllabi for Pre.PhD/Pre M.Phil/ Pre MS. W.e.f. 2005-2006 Batch
Sub. Code: R50520

PAVEMENT CONSTRUCTION MAINTENANCE AND MANAGEMENT

1. Pavement management system: Components of PMS and their activities; Major steps
in implementing PMS; Inputs; Design ;Construction and Maintenance; Rehabilitation
and Feedback systems; Examples of HDM and RTIM packages; Highway financing;
Fund generation; Evaluating alternate strategies and Decision criteria

2. Pavement Inventories and Evaluation: Serviceability Concepts ;Visual Rating ;
Pavement Serviceability Index; Roughness Measurements ;Distress Modes – Cracking
Rutting Etc; Pavement Deflection – Different Methods, Skid Resistance, Roughness,
Safety – Aspects; Inventory System – Assessment of Deficiencies

3. Pavement Maintenance and Quality Control: Causes of Deterioration, Traffic and
Environmental Factors, Pavement Performance Modelling Approaches and Methods of
Maintaining WBM, Bitumen and Cement Concrete Roads, Quality Assurance; Quality
Control – ISO 9000 , Sampling Techniques – Tolerances and Controls related to Profile
and Compaction

4. Construction of Base, Subbase, Shoulders and Drain: Roadway and Drain
Excavation, Excavation and Blasting, Embankment Construction, Construction of
Gravel Base, Cement Stabilised Sub- Bases, WBM Bases, Wet Mix Construction;
Crushed Cement Bases, Shoulder Construction; Drainage Surface, Turfing Sand Drains;
Sand Wicks; Rope Drains, Geo- Textile Drainage; Preloading Techniques

5. Bituminous Pavement Construction: Preparation and Laying of Tack Coat;
Bituminous Macadam ,Penetration Macadam, Built up Spray Grout, Open Graded
Premix, Mix Seal, Semi-Dense Asphalt Concrete-Interface Treatments and Overlay
Construction, IRC Specifications, Introducing Mechanical Mixers, Pavers, Finishers

6. Cement Concrete Pavement Analysis: Construction of Cement Roads, Manual and
Mechanical Methods, Joints in Concrete and Reinforced Concrete Pavement and
Overlay Construction –Related Equipment

7. Pavement Life Cycle Cost Analysis: Cost Components, Methods of LCA –Brief
Description –Items Considered –Case Studies

8. Pavement Maintenance Management: Components of Maintenance Management and
Related Activities – Network and Project Level Analysis –Budgeting; Prioritization
Techniques and Formulation of Maintenance Strategies

References:

1. Haas and Hudson , W. R. Pavement management systems –Mc. Graw Hill publications
2. Sargious, M. A. – Pavements and surfacing for highways and airports – Applied Science

Publishers ltd
3. Bridge and pavement maintenance- Transportation Research Record no.800, TRB
4. Shahin M.Y, 1994- Pavement management for airports, roads and parking lots
5. Bent Thagesan, 1996- Highway and traffic engineering for developing countries



Similer Documents