Table of Contents
DIVISION 100 GENERAL REQUIREMENTS
Conversion Tables of Weights and Measures
General Information and Instructions
ENGINEER'S ESTIMATE
Adjustment Factor for Public Works Davis-Bacon Zones
DAVIS-BACON/PURCHASER WAGE RATE ADJUSTMENTS
Davis-Bacon/Purchaser Wage Rate Adjustments
Adjustment Factor for Wage Differentials
TIME ESTIMATES & CALCULATION OF MIDPOINT OF CONSTRUCTION
Time Estimates and Calculation of Midpoint of Construction
Example 1: Analyzing Incremental Construction Periods
Example 2: Analyzing Construction Items
Example Graphical Display of Midpoint Calculations
Worksheet for Incremental Construction Periods
Time Estimating and Scheduling Worksheet
DIVISION 150 PROJECT REQUIREMENTS
Section 152. - CONSTRUCTION SURVEY AND STAKING
Section 153. - CONTRACTOR QUALITY CONTROL
Section 154. - CONTRACTOR SAMPLING AND TESTING
Section 156. - PUBLIC TRAFFIC
Section 157. - SOIL EROSION CONTROL
Section 160. - DEVELOP WATER SUPPLY AND WATERING
DIVISION 200 EARTHWORK
Section 201. - CLEARING AND GRUBBING
Individual Removal of Trees
Brushing
Section 202. - ADDITIONAL CLEARING AND GRUBBING
Section 203. - REMOVAL OF STRUCTURES AND OBSTRUCTIONS
Section 204. - EXCAVATION AND EMBANKMENT
Example Earthwork Calculation
HAUL
Section 208. - STRUCTURE EXCAVATION AND BACKFILL FOR SELECTED MAJOR STRUCTURES
Section 211. - ROADWAY OBLITERATION
Section 212. - LINEAR GRADING
Example Linear Grading Calculation
DIVISION 250 SLOPE REINFORCEMENT AND RETAINING WALLS
Section 251. - RIPRAP
Section 253. - GABIONS AND REVET MATTRESSES
Section 255. - MECHANICALLY-STABILIZED EARTH WALLS
Section 257. - ALTERNATE RETAINING WALLS
DIVISION 300 AGGREGATE COURSES
Section 301. - AGGREGATE COURSES
Basic Rock Cost
Example Basic Rock Calculation
Load and Apply
Aggregate Haul
Example Aggregate Haul Calculation
Section 303. - ROAD RECONDITIONING
Section 306. - DUST PALLATIVE
Section 321. - ROAD SURFACE STABILIZATION
DIVISION 400 ASPHALT PAVEMENTS AND SURFACE TREATMENTS
Section 400. - ASPHALT PAVEMENTS AND SURFACE TREATMENTS
Section 403. - HOT ASPHALT CONCRETE PAVEMENT
Section 409. - ASPHALT SURFACE TREATMENT
Section 410. - SLURRY SEAL
Section 411. - ASPHALT PRIME COAT
Section 412. - ASPHALT TACK COAT
Section 414. - ALPHALT PAVEMENT CRACK AND JOINT SEALING
Section 415. - PAVING GEOTEXTILES
Section 431. - SEAL FOR LIGHT TRAFFIC PAVEMENTS
Section 432. - ASPHALT PAVEMENT PATCHING
DIVISION 550 BRIDGE CONSTRUCTION
Cost Estimating Bridge Construction For Programming
Section 551. - DRIVEN PILES
Section 552. - STRUCTURAL CONCRETE
Section 553. - PRESTRESSED CONCRETE
Section 554. - REINFORCING STEEL
Section 555. - STEEL STRUCTURES
Section 556. - BRIDGE RAILING
Section 557. - TIMBER STRUCTURES
DIVISION 600 INCIDENTAL CONSTRUCTION
Section 601. - MINOR CONCRETE STRUCTURES
Section 602. - CULVERTS AND DRAINS
Culvert Material Base Price
Polyethylene Corrugated Pipe
Corrugated Metal Pipe
End Sections (Flared End Terminal Sections):
Section 603. - STRUCTURAL PLATE STRUCTURES
Section 604. - MANHOLES, INLETS, AND CATCH BASINS
Section 605. - UNDERDRAINS, SHEET DRAINS, AND PAVEMENT EDGE DRAINS
Section 606. - CORRUGATED METAL SPILLWAYS
Section 607. - CLEANING, RECONDITIONING, AND REPAIRING EXISTING DRAINAGE STRUCTURES
Section 609. - CURB AND GUTTER
Section 615. - SIDEWALKS, DRIVE PADS, AND PAVED MEDIANS
Section 617. - GUARDRAIL
Section 618. - CONCRETE BARRIERS AND PRECAST GUARDWALLS
Section 619. - FENCES, GATES AND CATTLE GUARDS
Section 621. - MONUMENTS AND MARKERS
Section 622. - RENTAL EQUIPMENT
Section 624. - TOPSOIL
Section 625. - TURF ESTABLISHMENT
Section 629. - ROLLED EROSION CONTROL PRODUCTS AND CELLULAR CONFINEMENT SYSTEMS
Section 633. - PERMANENT TRAFFIC CONTROL
Section 634. - PERMANENT PAVEMENT MARKINGS
Section 650. - ROAD CLOSURE DEVICES
Section 651. - DEVELOPMENT OF PITS AND QUARRIES
Section 660. - TIMBER CROSS DRAINS
EQUIPMENT RATES
LABOR RATES
TEMPORARY ROAD COST ESTIMATING
Example Temporary Road Calculation:
Cost Estimate Template for Temporary Roads