Download MRT Works General Specification PDF

TitleMRT Works General Specification
TagsSpecification (Technical Standard) Quality Assurance Rail Transport Transport
File Size1.5 MB
Total Pages226
Table of Contents
                            GSCEW Cover Sheet Rev.01.pdf
GSCEW Contents - Rev.01.pdf
G1 General - Rev.01.pdf
G2 The Site - Rev.01.pdf
G3 Site Establishment - Rev.01.pdf
G4 The Works - Rev.01.pdf
G5 Work In Roads - Rev.01.pdf
G6 Damage and Interference - Rev.01.pdf
G7 Temporary Electricity Supply - Rev.01.pdf
G8 Materials Equipment Packaging Storage - Rev.01.pdf
G9 Safety and Health - Rev.01.pdf
G10 QA & QC - Rev.01.pdf
G11 Environmental Management - Rev.01.pdf
G12 Planning Programming Progress - Rev.01.pdf
G13 Liaison With Others - Rev.01.pdf
G14 Document Management - Rev.01.pdf
G15 General Requirements for BS and ABWF - Rev.01.pdf
G16 Software Management & Control - Rev.01.pdf
G17 System Safety - Rev.01.pdf
G18 Testing and Commissioning - Rev.01.pdf
                        
Document Text Contents
Page 1

MASS RAPID TRANSIT CORPORATION SDN. BHD.









PROJEK MASS RAPID TRANSIT LEMBAH KELANG:

JAJARAN SUNGAI BULOH-KAJANG




GENERAL SPECIFICATION

FOR CIVIL ENGINEERING WORKS











MRT PROJECT OWNER:
MASS RAPID TRANSIT CORPORATION SDN

BHD
(902884-V)
Tingkat 12, Bangunan Setia 1,
15, Lorong Dungun, Bukit Damansara,
50490 Kuala Lumpur

PROJECT DELIVERY PARTNER (PDP):
MMC GAMUDA KVMRT (PDP) SDN BHD
(927050-H)
55-61, Jalan SS22/23, Damansara Jaya,
47400 Petaling Jaya,
Selangor Darul Ehsan

Page 113

PROJEK MASS RAPID TRANSIT LEMBAH KELANG 
Jajaran Sungai Buloh ‐ Kajang 

General Specification for Civil Engineering Works
Section G8 – Materials, Equipment, and Spare Parts

 

KVMRT/PDP/SBK/GEN/OP/GS/CS/0001  G8‐7 of 8 Revision: 01
 

Package Contractor in such a way that they do not interfere 
with the progress of the works of Other Works Contractors, 
and do not cause fire or safety hazards. 

  G8.5  Shipping and Delivery 

Shipping  G8.5.1  (1)  The Works Package Contractor shall notify the PDP ten (10) 
days  in  advance  of  any  expected  shipment  date  and  give 
further notification of the actual shipment date and routing 
when  such  information  is  subsequently  established.  This 
shall  complement  the  inspection  requirements  prior  to 
delivery as specified herein. 

(2)  Two  (2)  copies of packing  lists and quality  certificates  shall 
be attached  to each package  to be  shipped.   One  (1)  copy 
shall  be  placed  inside  the  package  and  the  other  copy 
outside  the  package.    A  copy  of  packing  lists  and  quality 
certificates  shall be  sent  to  the PDP  after  each package of 
the Works, the equipment, spare parts and other items to be 
shipped have been shipped. 

    (3)  Without prejudice  to  any other provisions of  the Contract, 
the  Works  Package  Contractor  shall  be  responsible  for  all 
legal  requirements,  duties,  dues,  taxes,  insurance,  storage 
charges  and  other  such  requirements  and  expenditures 
required  for  the  importation of  the Works,  the equipment, 
spare  parts  and  other  items  to  be  supplied  under  the 
Contract into Malaysia. 

(4)  For  imported  goods,  the  Works  Package  Contractor  shall 
clear the Works, the equipment, spare parts and other items 
to be  supplied under  the Contract  through  Jabatan Kastam 
Diraja  Malaysia  (Royal  Malaysian  Customs  Department)  in 
accordance with the relevant Statutory Requirements. 

Delivery  G8.5.2  (1)  The Works Package Contractor  shall deliver  the Works and 
all items to be supplied under the Contract to the Site. 

(2)  The Works Package Contractor  shall unload  the Works and 
all items to be supplied under the Contract at the designated 
delivery point and positioning or storing them. 

    (3)  Any part of the Works or any item to be supplied under the 
Contract which is damaged in transit shall not be considered 
as delivered until  repairs or  replacements have been made 
and all necessary  spare parts or  items have been delivered 
to the Site. 

(4)  All  documents,  manuals,  drawings  and  other  similar 
deliverables  shall  be  delivered  to  a  location  in  accordance 
with the PDP’s instructions.

Page 114

PROJEK MASS RAPID TRANSIT LEMBAH KELANG 
Jajaran Sungai Buloh ‐ Kajang 

General Specification for Civil Engineering Works
Section G8 – Materials, Equipment, and Spare Parts

 

KVMRT/PDP/SBK/GEN/OP/GS/CS/0001  G8‐8 of 8 Revision: 01
 

    (5)  The  Works  Package  Contractor  shall  store  and  secure  the 
Works,  equipment,  spare  parts  and  other  items  until  the 
same have been  inspected and are considered delivered at 
the designated point by the PDP. 

(6)  The  Works  Package  Contractor  shall  remove  temporary 
fittings required for shipment and re‐assembly of equipment 
shall complete  this prior  to  the equipment or parts  thereof 
being inspected and before they are considered delivered. 

(7)  An  item shall be considered delivered when all damage has 
been  repaired  and  all  documentation  and  post  delivery 
preparation have been completed to the satisfaction of the 
PDP. 

    (8)  Spare parts shall be consigned to the Railway Operator and 
delivered  in  accordance  with  the  PDP's  instructions  to  a 
programme  which  shall  ensure  that  sufficient  spares  are 
delivered  to  facilitate  normal  routine  maintenance  of  the 
Permanent Works by  the Railway Operator  at  all  stages of 
completion. 

 
 
 
 

END OF SECTION

Page 225

PROJEK MASS RAPID TRANSIT LEMBAH KELANG 
Jajaran Sungai Buloh ‐ Kajang 

General Specification for Civil Engineering Works
Section G18 – Testing and Commissioning

 

KVMRT/PDP/SBK/GEN/OP/GS/CS/0001  G18‐5 of 6 Revision: 01
 

necessary  for  the  safe  and  efficient  operation  of  the
systems and equipment supplied, installed or modified
under the Contract; and 

e)  All contingency plans necessary  to speedily and safely 
recover  from  any  mishaps  or  emergencies  that  may
arise  with  the  systems  and  equipment  supplied,
installed or modified under the Contract. 

    (7)  Training shall be carried out in the English language and in the
Bahasa Malaysia language as appropriate to each course. 

Training 
Methods 

G18.6  (1)  Training shall consist of classroom (theory) training, computer
based  interactive  multi‐media  training  (CBT),  simulator 
training, and practical  (hands on)  training, as appropriate  for 
each system. 

    (2)  The  training  shall  take  place  in  Malaysia,  unless  there  are
prohibitive  reasons,  and  shall  be  related  to  the  Permanent
Works. 

    (3)  In  order  to  ensure  that  satisfactory  standards  are  met,  the
railway  operator’s  operations/maintenance  department  in 
liaison with the training department will monitor all training. 

    (4)  The  Works  Package  Contractor  shall  assign  a  training 
coordinator  from  his  organization  to  be  responsible  for
training.  The training coordinator will be the main contact for
all matters related to training. 

    (5)  During  the Defects  Liability Period, when  the Works Package 
Contractor  is responsible  for  fault  finding and repair, he shall
provide  on  the  job  training  to  the  railway  operator’s 
maintenance staff. 

 
 
 
 

END OF SECTION

Page 226

PROJEK MASS RAPID TRANSIT LEMBAH KELANG 
Jajaran Sungai Buloh ‐ Kajang 

General Specification for Civil Engineering Works
Section G18 – Testing and Commissioning

 

KVMRT/PDP/SBK/GEN/OP/GS/CS/0001  G18‐6 of 6 Revision: 01
 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Page Not Used